Project Three

slide-f4fec89
slide-2feca5b
slide-f145459
slide-444258c
slide-f4fec89
slide-2feca5b

Objectives of the project:

Phase 1: Handling 50,000 barrels of oil and injected 70 million cubic feet of gas a day

Phase 2: Achieve 110,000 barrels of oil and inject 210 million cubic feet of gas a day

Geographical location of the project:

km north of Khorramshahr and 100 km southwest of Ahwaz, along the Ahwaz-Khorramshahr road

main contractor:

Phase 1 and 2 ENI / NICO

Project Implementation Activities:

Drilling of 3 wells and 5 wells and one well gas injection well The creation of a unit of operation with a nominal capacity of 55 thousand barrels per day All pipelines and pipelines in the first phase of the project Drilling 15 development loops, 3 gas injection wells and one wells water disposal Zayed, along with the creation of a unit of operation with a nominal capacity of 165 thousand barrels of oil On the day, including all lines of flow and well-developed facilities in the second phase

– Feasibility Study Phase III was conducted by ENI

– Define the descriptive stage of the design and preparation of documents for this part of the work using internal resources

Key layout times:

Date of Contract Entry: April 13,

Production of 50,000 barrels per day will be achieved on August 83

Production forecast reached 160 thousand barrels per day: September, 2002

Forecast of gas injection at 280 million cubic feet per day: Spring 2010

تماس با ما

شماره تماس خود را وارد کند. ما با شما به زودی تماس می گیریم!
درخواست تماس با موفقیت ارسال شد. به زودی تماس می گیریم
خطایی رخ داده است. دقایقی بعد مجدد تلاش کنید
ایمیل برای ما ارسال کنید
ایمیل ارسال شد به زودی با شما تماس میگیریم
ایمیل ارسال نشد مجدد تلاش کنید